AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Solaredge setapp firmware update4/16/2024 New Features and Enhancements G100 IntroductionĮREC G100 Issue 2 supersedes EREC G100 Issue 1 Amendment 2 “Technical Requirements for Customers Export and Import Limitation Schemes” and became mandatory for sites commissioned after May 1, 2023. Split Italy country settings into three new settings in order to help installers correctly set frequency and voltage thresholds: Updated Norwegian grid codes stage 1 frequency thresholds to: Updated parameters for Brazilian grid codes according to the national grid operator (ONS) Updated parameters for Hungarian grid codes Modified Vietnam grid code to support requirements of sites > 500kW R25 - PT1 time constant tau for Q(U) and P(V) is now available for installer input in the Power Control menus Code 27: "Japan 60Hz" => "Japan 1ph 202V L-N / 3ph 350V L-L 60Hz"Ĭountry code updated to support type A certification.Updated display names of grid codes for Japan: France (Coshpi = -0.94) and France MV (Cosphi = -0.94)Īdded new Czech inverter settings in accordance with ‘CEZ Distribuce’ defined thresholds.The following new grid codes for power configuration were created: France (Cosphi = 1) and France MV (Cosphi = 1).To avoid installer confusion, the name for ‘Old’ Australia grid codes was changed to ‘Obsolete’.Įxisting country code was m odified to Cosphi = 1: For more information please read this application noteĪ SE33.3K inverter with DCD will require a fixed string voltage ofĨ00Vdc to allow a 2-string design with S1200 Power Optimizers.SolarEdge inverters are now compliant with UNE217001: 2020-10 and Spain ITC-BT-40 (RD 244/2019) zero export to grid regulations.Language configuration is now performed via “SetApp side menu > Settings > Locale”, instead of via the “Commissioning > Country and Language” menu.Status SetApp page for Commercial inverters: added Sac, I1, I2, I3, V12, V23, V31 measurements as follows:.SetApp PID Activation menu: users can now differentiate between the built-in SolarEdge PID solution and an external third-party PID device. Go to the ‘Remote Settings’ menu in the Monitoring Platform’s ‘Admin’ tab to toggle the inverter’s PID Mitigation settings. The ability to enable PID mitigation remotely is now supported for Three Phase Synergy Technology inverters via the Monitoring Platform.
0 Comments
Read More
Leave a Reply. |